Total commander 9.0 beta 3.
During copying a folder and multiple files (within the folder) the progress indicator for the whole operation got to the percentage for the first file (eight percent) then when the second file started to be processed it was reset and this happened on each file, therefore the total job progress indicator never went above the largest file i.e. eight percent in my case. I expected it to rise to 100 percent.
tc 9.0 beta 3: 'progress indicator' percentage not 100%
Moderators: Hacker, petermad, Stefan2, white
- ghisler(Author)
- Site Admin
- Posts: 50550
- Joined: 2003-02-04, 09:46 UTC
- Location: Switzerland
- Contact:
It may never go to 100% because of how the progress bar works on windows: When I send "Set to 100%", Windows starts a background thread which slowly rises the value from the current percentage to 100%.
Author of Total Commander
https://www.ghisler.com
https://www.ghisler.com