[suggestion] Better Jobs Queue

Here you can propose new features, make suggestions etc.

Moderators: Hacker, petermad, Stefan2, white

Post Reply
dsuma
Junior Member
Junior Member
Posts: 11
Joined: 2007-03-13, 18:13 UTC

[suggestion] Better Jobs Queue

Post by *dsuma »

Harddrives with more than 500 GB are now in professional surrounding very normal. Imagine how long does it take to fill this GBs over Network?

So, I miss a improved Jobs Queue. I imagine a windows with possibility to add copy, move, ftp transmitions tasks, to priorise (sort them), do start more Jobs at same time, to stop some of them.
guent peer
Member
Member
Posts: 124
Joined: 2003-02-14, 08:15 UTC

Post by *guent peer »

a windows with possibility to add copy, move, ftp transmitions tasks, to priorise (sort them), do start more Jobs at same time, to stop some of them.
Most things are already possible. Just read TFM!
dsuma
Junior Member
Junior Member
Posts: 11
Joined: 2007-03-13, 18:13 UTC

Post by *dsuma »

@guent peer:
I'm a registered TC Power User. I know the possibilities.
guent peer
Member
Member
Posts: 124
Joined: 2003-02-14, 08:15 UTC

Post by *guent peer »

@guent peer:
I'm a registered TC Power User. I know the possibilities.
So explain your wishes in more details.

P.S. I'm also a TC User for quite a long time (#15509), but I never would claim to know all possibilities of TC.
dsuma
Junior Member
Junior Member
Posts: 11
Joined: 2007-03-13, 18:13 UTC

Post by *dsuma »

(#120343)

For example I started two copy jobs, with about 20gb per job each. Now I would like to priorize the second started higher than the one. This can be made with set the data throughput, or pause the job and this should start next to all other jobs.

I imagine a single job manager for all Jobs started, for example ftp download while coping files on your hd. it is not necessary to have two windows. One window can display both parallel working jobs.
guent peer
Member
Member
Posts: 124
Joined: 2003-02-14, 08:15 UTC

Post by *guent peer »

For example I started two copy jobs, with about 20gb per job each. Now I would like to priorize the second started higher than the one. This can be made with set the data throughput, or pause the job and this should start next to all other jobs.
If you pause, you are able to change the order of the jobs. This should possibly also change the priority of the jobs.
I imagine a single job manager for all Jobs started, for example ftp download while coping files on your hd. it is not necessary to have two windows. One window can display both parallel working jobs.
By clicking "+" on the Background transfer manager you can also add FTP- and HTTP-downloads and, of course, copy and move operations.
Post Reply