strider wrote:It's not very close to the date field and the behavior of the [>>] button is unexpected IMO (it just presents redundant date and time fields that are already present on the parent dialog).
The same is valid for the [Current] button.
strider wrote:So what's the point of having the additional, "Change Date/Time:" dialog open at all? Why not simply have those controls on the Date field (date picker) and the Time field (spinners) be part of the main "Change Attributes" page?
I think it's a compatibility issue concerning the following points:
1. The first date in "Search->Date between" can be left empty. This is IMHO not possible with the date control.
2. Cut and Paste is not available for date controls?
3. The date control acts like 3 separate Edit fields (D.M.Y). So it's not possible to type something like "1.1.1980" instead of this you must type "1RIGHT1RIGHT80"
4. Also you can type the month by number(5) it's alway shown as word(may). (may be depending on your regional settings from Control Panel) This is different to the date shown in the file list.
5. Most users don't know how to use this control without mouse.
I become crazy

(no offense), while watching an unexperienced user changing the time property by LMB mouse selecting h

s field and than clicking those tiny spin buttons.
BTW it quite simple to use the keyboard instead:
- Left/right navigate between d.m.y (h

s)
- Up/down increase/decrease
- direct enter the number (0..9)
- ALT+Down opens the Date-Picker
__ Left/Right changes the day
__ Up/Down changes the week
__ PgUp/PgDwn changes the month
__ CTRL+PgUp/PgDwn changes the year
__ Enter to select the Date
__ ESC to cancel the Date-Picker
So I think there are several Pro and Cons for the suggestion to completely replace the old edit field.
Kind regards
Holger